Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean euismod bibendum laoreet. Proin gravida dolor sit amet lacus accumsan et viverra justo commodo. Proin sodales pulvinar sic tempor. Sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Nam fermentum, nulla luctus pharetra vulputate, felis tellus mollis orci, sed rhoncus pronin sapien nunc accuan eget. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Energy Efficiency Optimization of Chinese Waste to Energy Plants

The project team commissioned GOPA Infra GmbH to complete a thematic summary report on Energy Efficiency Optimization of Chinese Waste to Energy Plants. The report is finished in May, 2022.

July 1, 2022

Life Cycle Assessment of Waste Management in Bengbu

This report summaries the life cycle assessment (LCA) of the waste management system in Bengbu, PR China. The appendix contains the detailed documentation of the LCA-modelling. The work was conducted between December 2019 and January 2021. The work was affected and delayed by the Coivd-19 pandemic. However, the outcome meets high international standards for LCA-modelling […]

April 2, 2021

Life Cycle Assessment of Waste Management in Suzhou

This report summaries the life cycle assessment (LCA) of the waste management system in Suzhou, PR China.  The appendix contains the detailed documentation of the LCA-modelling. The work was conducted between December 2019 and January 2021. The work was affected and delayed by the Coivd-19 pandemic. However, the outcome meets high international standards for LCA-modelling of […]

April 2, 2021